Presolve eliminates 20 constraints and 360 variables. Adjusted problem: 6282 variables, all binary 9989 constraints, all linear; 36520 nonzeros 1 linear objective; 18 nonzeros. CPLEX 8.1.0: clocktype = 2 timing=1 mipdisplay=2 mipstartvalue=1 Clique table members: 10031 MIP emphasis: balance optimality and feasibility Root relaxation solution time = 42.84 sec. Nodes Cuts/ Node Left Objective IInf Best Integer Best Node ItCnt Gap 0 0 4.8778 2565 4.8778 7795 5.4107 2308 Cuts: 864 27374 10.0000 2602 Cuts: 586 36941 10.0000 2758 Cuts: 139 44669 Heuristic still looking Heuristic still looking Heuristic still looking Heuristic complete 100 62 11.0000 1537 10.0000 280240 200 111 infeasible 10.0000 386527 300 158 12.0000 2235 10.0000 554616 400 219 13.2500 1639 10.0000 677720 500 271 10.2500 2128 10.0000 845510 (cplex) GUB cover cuts applied: 176 Clique cuts applied: 502 Cover cuts applied: 335 Gomory fractional cuts applied: 1 Times (seconds): Input = 0.15 Solve = 8989.57 Output = 0.01 CPLEX 8.1.0: aborted, no integer solution. 934197 MIP simplex iterations 574 branch-and-bound nodes; no basis.